Nurol Holding INC.Nurol Holding INC.

SUPPLIERS
Menu
  • CORPORATE
      • 60th Year Message
      • HISTORY
      • Chairman’s Message
      • Board of Directors
      • Organization
      • Nurol Holding Inc.
      • Code Of Governance
      • ANNUAL REPORT
      • Presentation Films
      • FOUNDATION
        • Nurettin Çarmıklı Books
        • Nurol Art Gallery
        • Nurol Education, Culture And Sports Foundation
      • INFORMATION
        • Information Society Services
        • Personal Data Protection
        • Information Security Policy
        • Business Continuity Policy
    Close
  • SECTOR
      • CONSTRUCTION AND COMMITMENT
        • Nurol Construction
        • Nurol Real Estate Investment Co. Inc.
        • Motorway Investment And Management INC
        • Nurol LLC
        • Nurol Georgia LLC
      • DEFENSE AND MANUFACTURING
        • Nurol Machine
        • Nurol Technologies Industry
        • FNSS
      • ENERGY AND MINING
        • Tümad Mining Industry and Trade Inc.
        • Nurol Energy Production and Marketing Inc.
        • Enova Energy Production Inc.
        • Nurol Göksu Electricity Generation Inc
      • FINANCE SECTOR
        • Nurol Investment Bank
        • Nurol Insurance
      • TOURISM SECTOR
        • Turser Tourism Services Publishing and Trade Inc.
        • Bosfor Tourism Management Inc.
      • TRADE AND SERVICE
        • Nurol Management and Property Management Co.
        • Nurol Aviation Inc.
        • Botim Business Administration and Trade Inc.
    Close
  • INVESTOR RELATIONS
  • HUMAN RESOURCES
  • SUSTAINABILITY
    • Sustainability Message
    • Memberships
    • Policies
    • Sustainability Reports
    • Close
  • MEDIA
  • CONTACT
  • TR
  • 0
NUROL HOLDİNG
03 April 2014 / Published in Nurol In Media

Batu Pasiner: “Demands and holiday wishes of guests are changing” | Akdeniz Güncel / 03.04.2014

Batu Pasiner, General Director of Club Salime Holiday Village located at Kemer Beldibi region mentioned that they plan to increase the satisfaction and pleasure of customers by realized renovation works. Pasiner said that; “Demands and holiday understandings of customers are changing. It is required to perform these investments in order to catch up these changing
  • 0
NUROL HOLDİNG
02 April 2014 / Published in Nurol In Media

Second tube is opened at the end of April | Hürriyet Bursa / 02.04.2014

After the first tube of Samanlı Tunnel at Organgazi passage of Gebze – Orhangazi – İzmir Highway which shall reduce to 4,5 hours the travel period in between İSTANBUL – İZMİR has been inaugurated at first week of March, excavations at the second tube are almost completed. Company authorities performing tunnel construction stated that cross
  • 0
NUROL HOLDİNG
01 April 2014 / Published in Nurol In Media

NUROL REIT has introduced its third project | Sektörel Tanıtım İnşaat Malzeme / 01.04.2014

With the motto “Live for Yourself”, Nurol REIT is putting the Nurol Life Aslantepe project into practice in Seyrantepe which is the shining star of İstanbul recently. Properly reading the future lifestyle, especially the requirements of metropol and carrying out its projects with “Investment to Life” mentality; Nurol REIT has introduced its third project in
  • 0
NUROL HOLDİNG
30 March 2014 / Published in Nurol In Media

Kaleydoskop Exhibition | Habertürk Ankara / 30.03.2014

Kaleydoskop Group Exhibition of Glass was presented to art-lovers of Ankara yesterday. At the exhibition which was presented to taste of lots of art – lovers there are many magnificent glass works of 7 different artists.
  • 0
NUROL HOLDİNG
29 March 2014 / Published in Nurol In Media

Highway at final speed | Ekonomi / 29.03.2014

Works of Gebze – İzmir Highway Project which is the biggest in Europe and second biggest in the world continued substructure investment are continued on the final speed. Companies at the consortium which has been awarded at the tender of project for which it is assumed to have approximately 870 million TL savings are planned
  • 0
NUROL HOLDİNG
28 March 2014 / Published in Nurol In Media

Gebze – İzmir Highway shall be completed as of 2015 | Demokrat Gebze / 28.03.2014

Uğur Doğan which is CEO of Nurol Holding that is one of the important actors of construction sector mentioned that the most important job of them in Turkey is Gebze – İzmir Highway construction. Mr. Doğan mentioned that ‘our consortium partnership at Gebze – İzmir Highway is continued. Construction is continued in conformance with planned
  • 0
NUROL HOLDİNG
27 March 2014 / Published in Nurol In Media

Nurol Holding has its eyes on World Cup | Ticari Hayat / 27.03.2014

Uğur Doğan, CEO of Nurol Holding which is one of the important actors of Construction sector said that many stadiums shall be constructed at Qatar under the scope of 2022 World Cup and they are closely interested in these projects as a group. Doğan answered questions of Reuters during Uludağ Economy Summit and said that;
  • 0
NUROL HOLDİNG
25 March 2014 / Published in Nurol In Media

Chorus of Woman and doctors | Hürriyet Ankara / 25.03.2014

NUROL Turkish Music Society organized a concert at State Art and Sculpture Museum Operetta Stage on behalf of World Women’ Day and Doctor’s Day. Chorus in which there are women and health care personnel presented a musical feast to guests by songs in Hicaz, Hüzzam and Nihavent tunes. Nurol Holding Chairman Nurettin Çarmıklı, Vice president
  • 0
NUROL HOLDİNG
18 March 2014 / Published in News From Us

Gebze-İzmir Motorway Suspension Bridge North Tower Caisson Foundation Submerging Ceremony

Through the ceremony executed on March 15th, 2014 with the participation of Mr. Recep Tayyip Erdogan H.E. Prime Minister of the Republic of Turkey and distinguished guests, the caisson foundation structure of the north tower has been submerged to the sea bed prepared by soil treatment at a depth of 40m, through a sensitive submerging
  • 0
NUROL HOLDİNG
18 March 2014 / Published in News From Us

Ordu Peripheral Highway – Oceli Tunnel has been completed

Within the scope of the Ordu Peripheral Highway being in progress under our commitment, the excavation works of the Oceli Tunnel (2×2100 m) has been completed by the unification of both tubes on March 14th, 2014. Excavation and final concreting works of the other tunnels in the Project’s scope, namely the Boztepe (2x3300m) and Terzili
  • 55
  • 56
  • 57
  • 58
  • 59

MEDIA

NEWS FROM US

NUROL IN MEDIA

NUROL IN MEDIA

LATEST NEWS

  • International Contracting Services Awards Ceremony

  • Delivery of Turkish-Made 6×6 APCs to Syrian Army Completed

  • A Taste of Mexico in Ankara: Traditional Flavors on the Table

  • FNSS Ranks on ISO Second 500 List

  • Türkiye and the UK Hold Strong Potential for Joint Projects

  • GET SOCIAL
Nurol Holding INC.

©2017 Nurol Holding Inc. | Information Society Services | Personal Data Protection | Site Map | Contact | Google Maps

TOP