Nurol Holding INC.Nurol Holding INC.

SUPPLIERS
Menu
  • CORPORATE
      • 55th Year Message
      • HISTORY
      • Chairman’s Message
      • Board of Directors
      • Organization
      • Nurol Holding Inc.
      • Code Of Governance
      • ANNUAL REPORT
      • Presentation Films
      • FOUNDATION
        • Nurettin Çarmıklı Books
        • Nurol Art Gallery
        • Nurol Education, Culture And Sports Foundation
      • INFORMATION
        • Information Society Services
        • Personal Data Protection
        • Information Security Policy
        • Business Continuity Policy
    Close
  • SECTOR
      • CONSTRUCTION AND COMMITMENT
        • Nurol Construction
        • Nurol Real Estate Investment Co. Inc.
        • Motorway Investment And Management INC
        • Nurol LLC
        • Nurol Georgia LLC
      • DEFENSE AND MANUFACTURING
        • Nurol Machine
        • Nurol Technologies Industry
        • FNSS
      • ENERGY AND MINING
        • Tümad Mining Industry and Trade Inc.
        • Nurol Energy Production and Marketing Inc.
        • Enova Energy Production Inc.
        • Nurol Göksu Electricity Generation Inc
      • FINANCE SECTOR
        • Nurol Investment Bank
        • Nurol Insurance
      • TOURISM SECTOR
        • Turser Tourism Services Publishing and Trade Inc.
        • Bosfor Tourism Management Inc.
      • TRADE AND SERVICE
        • Nurol Management and Property Management Co.
        • Nurol Aviation Inc.
        • Botim Business Administration and Trade Inc.
    Close
  • INVESTOR RELATIONS
  • HUMAN RESOURCES
  • SUSTAINABILITY
    • Sustainability Message
    • Memberships
    • Policies
    • Sustainability Reports
    • Close
  • MEDIA
  • CONTACT
  • TR

The 4th biggest of the world shall be completed at the end of the year | Türkiye / 16.01.2015

The towers are completed at the 4th longest bridge of the world with 1500 meters mid-span. The construction is also expected to be completed by the end of the year… The towers are completed in İzmit Bay Crossing Bridge construction, which is the most important section of Gebze – Orhangazi – İzmir Highway Project that shall decrease Istanbul – İzmir highway trip to 3,5 hours.. The bridge, which is planned to have a total length of 2.682 meters and designed to have a mid-span of 1500 meters shall be the 4th biggest bridge of the world. The tower height of the bridge shall be 254 meters and it shall serve with total 6 lanes, 3 lanes being in each direction with an additional service lane. The bay crossing, which currently takes 70 minutes by highway and 60 minutes by ferryboat, shall decrease to 6 minutes upon completion of the project, where non – stop works are ongoing for 24 hours with 1300 employees. 35 USD plus VAT (Approx. 90 Lira) shall be paid as bridge toll for İzmit Bay Crossing Bridge, which is expected to be completed at the end of this year and which is realized with an investment of 1.1 billion USD. According to the information conveyed, stringing of the messenger cable is started for the main cable that shall carry the decks on which vehicles shall pass and thus the two sides are meeting for the first time. The works for joining the decks shall be started when the installation of the main cable is completed. The project covers 433 kilometers, out of which 384 kilometers is the highway 43 kilometers is the connection roads. In the project, 6 viaducts out of the total 14 have been completed and the bridge towers each reaching to a height of 254 meters are manufactures by welding 88 steel blocks to each other. The weight of each of these 88 blocks varied between 170 to 350 tons.

MEDIA

NEWS FROM US

NUROL IN MEDIA

NUROL IN MEDIA

LATEST NEWS

  • Delivery of Turkish-Made 6×6 APCs to Syrian Army Completed

  • A Taste of Mexico in Ankara: Traditional Flavors on the Table

  • FNSS Ranks on ISO Second 500 List

  • Türkiye and the UK Hold Strong Potential for Joint Projects

  • Nurol Makina Develops Solutions for Europe’s Defense Market in Hungary

  • GET SOCIAL
Nurol Holding INC.

©2017 Nurol Holding Inc. | Information Society Services | Personal Data Protection | Site Map | Contact | Google Maps

TOP