Nurol Holding INC.Nurol Holding INC.

SUPPLIERS
Menu
  • CORPORATE
      • 55th Year Message
      • HISTORY
      • Chairman’s Message
      • Board of Directors
      • Organization
      • Nurol Holding Inc.
      • Code Of Governance
      • ANNUAL REPORT
      • Presentation Films
      • FOUNDATION
        • Nurettin Çarmıklı Books
        • Nurol Art Gallery
        • Nurol Education, Culture And Sports Foundation
      • INFORMATION
        • Information Society Services
        • Personal Data Protection
        • Information Security Policy
        • Business Continuity Policy
    Close
  • SECTOR
      • CONSTRUCTION AND COMMITMENT
        • Nurol Construction
        • Nurol Real Estate Investment Co. Inc.
        • Motorway Investment And Management INC
        • Nurol LLC
        • Nurol Georgia LLC
      • DEFENSE AND MANUFACTURING
        • Nurol Machine
        • Nurol Technologies Industry
        • FNSS
      • ENERGY AND MINING
        • Tümad Mining Industry and Trade Inc.
        • Nurol Energy Production and Marketing Inc.
        • Enova Energy Production Inc.
        • Nurol Göksu Electricity Generation Inc
      • FINANCE SECTOR
        • Nurol Investment Bank
        • Nurol Insurance
      • TOURISM SECTOR
        • Turser Tourism Services Publishing and Trade Inc.
        • Bosfor Tourism Management Inc.
      • TRADE AND SERVICE
        • Nurol Management and Property Management Co.
        • Nurol Aviation Inc.
        • Botim Business Administration and Trade Inc.
    Close
  • INVESTOR RELATIONS
  • HUMAN RESOURCES
  • SUSTAINABILITY
    • Sustainability Message
    • Memberships
    • Policies
    • Sustainability Reports
    • Close
  • MEDIA
  • CONTACT
  • TR

Ordu Peripheral Road | Ordu Olay / 17.12.2015

Governor İrfan Balkanlıoğlu issued statements about Ordu Peripheral Road, 3 312 meters long left tube and 3 308 meters long right tube, 6 621 meters in total. “The excavation and shoring work for Boztepe Tunnel has just been finished” said the Governor and reminded that there are 12 pedestrian crossings, 16 crossroads on the Blacksea Coastal Road which runs 20 kilometers through the city, and it takes between 25-40 minutes to across it. Balkanlıoğlu stated that the operations is about to come to an end and with the opening of the peripheral road this 40 minutes will reduce to 10 minutes leading to a serious relief in traffic. “As for 2 360 metres long Terzili Tunnel we are halfway through in excavation and shoring whereas the entrance and exit parts, in both left and right tubes is completed.” Balkanlıoğlu conveyed that the operations in viaducts and bridges have been proceeding without slowing down and added: “The operations in Civil Viaduct, Perşembe junction overpass bridge and Perşembe junction underpass bridge are in progress. The manufacturing of the abutments, bridge floor concretes, pavement concretes, the side panels of the bridges and the beam installations of Civil viaduct has been completed, the pedestrian guardrails are still being fabricated.”

MEDIA

NEWS FROM US

NUROL IN MEDIA

NUROL IN MEDIA

LATEST NEWS

  • Nurol Holding 2023 Sustainability Report is Published

  • FNSS Signs New Generation Vehicles Agreement with the Turkish Land Forces Command

  • A Meaningful Contribution from Nurol Holding for Cultural Heritage

  • NurolBank Photography Club Exhibition: “In Pursuit of Light”

  • We Have Renewed Our ISO 50001:2018 Energy Management System Certification

  • GET SOCIAL
Nurol Holding INC.

©2017 Nurol Holding Inc. | Information Society Services | Personal Data Protection | Site Map | Contact | Google Maps

TOP