Nurol Holding INC.Nurol Holding INC.

SUPPLIERS
Menu
  • CORPORATE
      • 55th Year Message
      • HISTORY
      • Chairman’s Message
      • Board of Directors
      • Organization
      • Nurol Holding Inc.
      • Code Of Governance
      • ANNUAL REPORT
      • Presentation Films
      • FOUNDATION
        • Nurettin Çarmıklı Books
        • Nurol Art Gallery
        • Nurol Education, Culture And Sports Foundation
      • INFORMATION
        • Information Society Services
        • Personal Data Protection
        • Information Security Policy
        • Business Continuity Policy
    Close
  • SECTOR
      • CONSTRUCTION AND COMMITMENT
        • Nurol Construction
        • Nurol Real Estate Investment Co. Inc.
        • Motorway Investment And Management INC
        • Nurol LLC
        • Nurol Georgia LLC
      • DEFENSE AND MANUFACTURING
        • Nurol Machine
        • Nurol Technologies Industry
        • FNSS
      • ENERGY AND MINING
        • Tümad Mining Industry and Trade Inc.
        • Nurol Energy Production and Marketing Inc.
        • Enova Energy Production Inc.
        • Nurol Göksu Electricity Generation Inc
      • FINANCE SECTOR
        • Nurol Investment Bank
        • Nurol Insurance
      • TOURISM SECTOR
        • Turser Tourism Services Publishing and Trade Inc.
        • Bosfor Tourism Management Inc.
      • TRADE AND SERVICE
        • Nurol Management and Property Management Co.
        • Nurol Aviation Inc.
        • Botim Business Administration and Trade Inc.
    Close
  • INVESTOR RELATIONS
  • HUMAN RESOURCES
  • SUSTAINABILITY
    • Sustainability Message
    • Memberships
    • Policies
    • Sustainability Reports
    • Close
  • MEDIA
  • CONTACT
  • TR

Öceli Tunnel was opened | Ordu Olay / 25.03.2014

First stage of tunnels of which construction is continued under the scope of “Ordu Ring Road Project” which is one of the most challenging sections of Öceli Tunnel Black Sea Coast Road was opened. Ordu 6.500 m long “Öceli Tunnel” which is the first stage and which is the most challenging part of Ring Road Project was started to be used. Company authorities assumed the construction mentioned that “Black Sea Coast Road has been started to be used as of 2007 aiming to reduce local traffic load and to provide required standards for transit traffic. However, Ordu provincial passage has been the most blocking section of 542 km long coast road and most of the time has been lost in this section of the road. Heavy commercial trucks and vehicles loaded by dangerous substances are still using the roads passing through City Center and this brings serious risks for citizens and the city. These risks shall be reduced by Ordu Ring Road”.

MEDIA

NEWS FROM US

NUROL IN MEDIA

NUROL IN MEDIA

LATEST NEWS

  • Nurol Holding 2023 Sustainability Report is Published

  • FNSS Signs New Generation Vehicles Agreement with the Turkish Land Forces Command

  • A Meaningful Contribution from Nurol Holding for Cultural Heritage

  • NurolBank Photography Club Exhibition: “In Pursuit of Light”

  • We Have Renewed Our ISO 50001:2018 Energy Management System Certification

  • GET SOCIAL
Nurol Holding INC.

©2017 Nurol Holding Inc. | Information Society Services | Personal Data Protection | Site Map | Contact | Google Maps

TOP