Nurol Holding INC.Nurol Holding INC.

SUPPLIERS
Menu
  • CORPORATE
      • 55th Year Message
      • HISTORY
      • Chairman’s Message
      • Board of Directors
      • Organization
      • Nurol Holding Inc.
      • Code Of Governance
      • ANNUAL REPORT
      • Presentation Films
      • FOUNDATION
        • Nurettin Çarmıklı Books
        • Nurol Art Gallery
        • Nurol Education, Culture And Sports Foundation
      • INFORMATION
        • Information Society Services
        • Personal Data Protection
        • Information Security Policy
        • Business Continuity Policy
    Close
  • SECTOR
      • CONSTRUCTION AND COMMITMENT
        • Nurol Construction
        • Nurol Real Estate Investment Co. Inc.
        • Motorway Investment And Management INC
        • Nurol LLC
        • Nurol Georgia LLC
      • DEFENSE AND MANUFACTURING
        • Nurol Machine
        • Nurol Technologies Industry
        • FNSS
      • ENERGY AND MINING
        • Tümad Mining Industry and Trade Inc.
        • Nurol Energy Production and Marketing Inc.
        • Enova Energy Production Inc.
        • Nurol Göksu Electricity Generation Inc
      • FINANCE SECTOR
        • Nurol Investment Bank
        • Nurol Insurance
      • TOURISM SECTOR
        • Turser Tourism Services Publishing and Trade Inc.
        • Bosfor Tourism Management Inc.
      • TRADE AND SERVICE
        • Nurol Management and Property Management Co.
        • Nurol Aviation Inc.
        • Botim Business Administration and Trade Inc.
    Close
  • INVESTOR RELATIONS
  • HUMAN RESOURCES
  • SUSTAINABILITY
    • Sustainability Message
    • Memberships
    • Policies
    • Sustainability Reports
    • Close
  • MEDIA
  • CONTACT
  • TR

First round in ring road – Ordu Hayat – 30.08.2017

A 30 million-lira fuel saving will also be achieved when the divided highway being constructed on the steep and impassable mountains of the Blacksea, whose overall length is 19 km, comprising 3 viaducts, 2 subways, and 3 bridge crossings, is completed. Enver Yılmaz, Metropolitan Municipality Mayor, inspected the Ordu Ring Road being in the stage of completion, on which asphalting works are conducted. Mayor Yılmaz, who inspected the belt highway by his own car, heralded city traffic will be relieved by the opening of the highway. Yılmaz indicated 90 percent of the first phase, being 10.7 km, of Ordu Rİng Road whose total length is 21.4 km, has been completed, and said “Currently, asphalting works and production of intersections between Altınordu-Fatsa are being conducted. City crossing, which takes 45 minutes, and sometimes even an hour, will drop to 10 minutes upon completion of the road.”

MEDIA

NEWS FROM US

NUROL IN MEDIA

NUROL IN MEDIA

LATEST NEWS

  • Nurol Holding 2023 Sustainability Report is Published

  • FNSS Signs New Generation Vehicles Agreement with the Turkish Land Forces Command

  • A Meaningful Contribution from Nurol Holding for Cultural Heritage

  • NurolBank Photography Club Exhibition: “In Pursuit of Light”

  • We Have Renewed Our ISO 50001:2018 Energy Management System Certification

  • GET SOCIAL
Nurol Holding INC.

©2017 Nurol Holding Inc. | Information Society Services | Personal Data Protection | Site Map | Contact | Google Maps

TOP