OTOYOL YATIRIM ve İŞLETME A.Ş.  ackground;                     completed by signing the  finance documents on June


               the  tender  for  Motorway  Project  for  Gebze  -   05,2015. Thus, the funding required for the entire project in
        BOrhangazi - Izmir (including İzmit bay crossing and    the form of refinanced loan of 2 billion USD for Phase I and
         Connection Roads) was conducted on 9 April 2009 and the   Phase II A as well as funding required for Phase II B have
         proposal submitted by Nurol - Özaltın -Makyol - Astaldi -   been secured with a new loan package amounting to 4.956
         Yüksel - Göçay Group was selected as to be the best    billion USD. As of the end of March 2016, approximately 3,84
         proposal with 22 years and 4 months construction and   billion USD has been spent towards project costs, divided as
         operating period.                                      follows: Phase I 2,65 billion USD, Phase II A 410 million  USD
                                                                and Phase II B 780 million USD.
         OTOYOL YATIRIM  VE İŞLETME  A.Ş. was founded on 20
 Kemal Yavuz BATUM  September 2010 with the contribution of the companies   Turkish Leadres;
 CEO     (Nurol - Özaltın -Makyol - Astaldi - Yüksel - Göçay) to perform
         the works of construction, operation and transfer of Gebze -   Akbank, Finansbank, Ziraat Bankası, Garanti Bankası, Halk
         Orhangazi – Izmir (including İzmit bay crossing and    Bankası, İş Bankası, Vakıflar Bankası, Yapı ve Kredi bankası.
 Board  Foundation Date               : 2010  Connection Roads) Motorway  Project through Build -
 M. Oğuz ÇARMIKLI  Headquarters               : ANKARA / TURKEY  Foreign Leadres;
 Tommaso SABATO  Number of Employees           : 351  Operate - Transfer model.
 Hayrettin ÖZALTIN  Total Number of Employees in Project: 6.280  The project implementation agreement was signed   Deutsche Bank, Saudi National Commercial Bank, Bank of
 Adnan ÇEBİ                                                     China, Siemens Bank.
 M. Erdal EREN  between the General Directorate of highways and OTOYOL
 M. Ali ÇEBİ  YATIRIM VE İŞLETME A.Ş. on 27 September 2010.     Project and Route

 CEO  Technical Managers  Project Manager  The ceremony go start of construction works in Gebze for   As this new project will shorten the route about 140 km when
 Kemal Yavuz BATUM  Salim HUNÇ (Design Monitoring Man.)  Fatih ZEYBEK (Suspension Bridge Const.)  Gebze - Orhangazi - Izmir Motorway Project took place on   compared to the current state highway, the travel time
 Serkan KIRDOĞAN (Environmental Man.)  Melih ŞİVİLOĞLU (Bursa - Susurluk)  28 October 2010 in Dilovasi district of Kocaeli Province and   corresponding to 8-10 hours will be shortened to 3,5 - 4
 CFO  Mehmet İstemi ÖZESER (HS Man.)  Rıfat Özcan BAŞKAZANCI
 Fatih Mehmet COŞAN  Sait ÖZYURT (Quality Assurance Man.)  (Southern Approach Viaduct Constr.)  Ceremony for start of construction works in İzmir was held   hours, which will provide  TL 870 million saving a year in turn.
 Mahmut ÇEVRİ (Technical Office Man.)  Necati BULUT (Kırkağaç - İzmir)  in Alsancak Cumhuriyet Square on 27 February 2011.
 General Manager  Ümit ÖNSAL (Service Facilities)               The starting point of the project is Gebze and the Motorway
 Hikmet TUĞLU (Construction)  Legal Consultancy  İlhan BORA (Balıkesir - Kırkağaç)  İstanbul - Bursa - İzmir  Motorway, Intersections between   will cross İzmit bay located between Dilovası and Hersek
 Bülent ESENDAL (Operation)  Murat SÜMER  Erdoğan VARLIK (Susurluk - Balıkesir)
 Alp GÜRDİL (Service Facilities)  Dilara ZAİM  Ceyhun ÇETİN ( Gebze - Orhangazi - Bursa)  Gebze and Gemlik (including Osmangazi Suspension   through a Suspended Bridge of about 3.000 meters
 Osman AÇIKALIN (NÖMAYG)  Nur DOĞAN  Bridge) has been opened to traffic on July 1, 2016.  length, then will extend to Orhangazi and Gemlik and be
                                                                connected to Bursa Ring Road at Ovaakça intersection.
 Vice Director General   Otoyol  Yatırım ve İşletme A.Ş.
 Abidin AKBULUT
 Ali Nebil ÖZTÜRK  Procured services such as gulf soil surveys, motorway   Following the Bursa Ring Road which is already
 Kutlu KATAR                                                    operational, the Motorway reaches Balıkesir starting with
 Halil OMURTAK  route soil surveys, signature of Motorway and Suspended   Bursa - Karacabey intersection and continuing through
 Murat KOŞAL  Bridge construction contract and design works, legal
 Ayhan ŞAHİN  infrastructure studies and project consultancy services for   the north of Susurluk. It continues south from the west of
         the motorway project and performed activities required   Balıkesir, ahead  via Savaştepe, Soma, Kırkağaç districts
         for preliminary preparation activities in physical aspects  and continues towards the west near Turgutlu. It moves
         and project financing.                                 along  paralel to İzmir - Uşak state highway  and finally
                                                                connects with Anadolu Lisesi intersection over the İzmir
         The Project financing for Phase I (from Gebze to Gemlik   ring road.
         Intersection including the Osmangazi Suspension Bridge)
         and Phase II  A (from Gemlik Intersection to Bursa     The project has a total length of 433 km including
         Intersection)  were completed in the first quarter of 2013   a highway length of 384 km and an access road length of
         and in the second quarter of 2014, respectively. 2,0 billion   49 km. Along the route, there are 38 viaducts with a total
 CONTACT INFORMATION  USD loan was secured via a 1,4 billion USD equity   length of 21.547 m, including the Osmangazi Suspension
         commitment by shareholders.                            Bridge and the Northern/ Southern  Approach Viaducts,
 Address     : Üniversiteliler Mah. Bilkent Plaza               3 tunnels with a total length of 6.380 m, 169 bridges, 20 toll
           A3 Blok No:21-24 Bilkent 06800  The process of refinancing this debt to extend the maturity
           Çankaya - ANKARA / TURKEY                            collection areas, 25 intersections, 4 Highways and 2 Tunnel
 Telephone: +90 (312) 291 33 00  and secure required additional funding of 3,0 billion USD   Maintenance-Operation  Centres,  as  well  as  35  Service
 Fax        : +90 (312) 266 09 95
         for Phase II B (from Bursa Intersection to İzmir) was
 otoyol@otoyolas.com.tr                                         Stations and Parking Areas.
 www.otoyolas.com.tr