                                                                 Contract  Date of   Date of
          Project Name                      Client                                       Job Description
                                                                 Amount   Contract  Completion
                                                                                         Hydromechanical Equipment Manufacturing
          BEYHAN 1 HEPP                     Kalehan Energy       13.553.136 $  19/10/2011  30.02.2015
                                                                                         and Erection Works
          Paravani Hydroelectric Plant Regulator, Valve Chamber, Plant                   Construction and Hydromechanical Equipment
          House Construction And Hydromechanical Equipment Provision   Georgia Urban Enerji Ltd.  19.332.984 $  06/06/2012  12/08/2014  Manufacturing and Erection Works
          Works
                                                                                         Hydromechanical Equipment Manufacturing
          Artvin Dam  and HEPP              Alstom Renewable Energy Inc.  1.793.614 $  14/03/2013  30/10/2015
                                                                                         and Erection Works
                                                                                         Sprial Case and Rings Fabrication.of
                                                                                         Paravani HEPP and Generator Upper&Lower
          Heavy Welded Components of Arkun HEPP and Paravani HEPP   Alstom Renewable Energy Inc.  483.819 $  31/01/2013  12/08/2014
                                                                                         Brackets,Collector Cover, Upper Floor Cover
                                                                                         Manufacturings of Arkun HEPP.
          Heavy Welded Components of Beyhan I HEPP  / Turkey and                         Several Component Manufacturing ( Generator
 İzmit Bay Bridge South Approach Viaduct Project  Paravani HEPP   Alstom Renewable Energy Inc.  455.030 $  21/04/2013  27/03/2014  Upside&down connection parts)
                                                                                         Hydromechanical Equipment Manufacturing
          Kiğı HEPP                         Özaltın İnşaat Ticaret ve Sanayi A.Ş.  8.146.754 $  01/03/2013  In Progress
                                                                                         and Erection Works
          Yukarı Kaleköy Dam and HEPP       Voith Hydro Limited Sirketi  712.733 $  03/01/2014  25/09/2014  Manufacturing of draft tube with cone
                                                                                         Hydromechanical Equipment Manufacturing
          Yukarı Kaleköy Dam and HEPP       Kalehan Energy      12.968.875 $  19/12/2013  In Progress
                                                                                         and Erection Works
          Artvin Dam  and HEPP              Alstom Renewable Energy Inc.  356.533 $  18/02/2014  20/11/2015  Tailrace Bulkhead Manufacturing
          Yukarı Kaleköy Dam and HEPP       Voith Hydro Limited Sirketi  1.391.210 $  18/02/2014  27/08/2015  Spiral Case Manufacturing
          Yukarı Kaleköy Dam and HEPP       Andritz Hydro        299.328 $  16/05/2014  29/05/2015  Stator Frame Manufacturing
          Artvin Dam  and HEPP Project      Alstom Renewable Energy Inc.  1.082.541 $  01/10/2014  31/03/2015  Spillway Gate Manufacturing
          Yukarı Kaleköy Dam and HEPP       Voith Hydro Limited Sirketi  109.522 $  11/09/2014  31/03/2015  Pit Liner Manufacturing
          Yukarı Kaleköy Dam and HEPP       Voith Hydro Limited Sirketi  100.153 $  11/09/2014  20/02/2015  Spiral Case Pressure Test Head & Insert Ring
                                                                                         Inlet and Outlet Tunnel ( DT1 + DT2 )
          Cetin HEPP                        Andritz Hydro        1.060.308 $  22/09/2014  27/02/2015
                                                                                         Embedded Parts
          Goktas I Dam and HEPP             Bereket Enerji       134.426 $  14/09/2015  22/12/2015  Lifting Equipment and Fish Elevator Crane and Car
          Akıncı HEPP                       Bereket Enerji       336.029 $  23/12/2015  In Progress   3 Unit spiral case manufacturing.
                                                                                         Manufacturing of Main Inlet Valve Upstream-
          Gilboa Pumped Storage Power Plant  GE-Alstom           147.653 $  02/02/2016  In Progress   Downstream Sleeves
 Special Structures Electrical and Mechanical Works, Doha/Qatar                          Manufacturing of various pipes and fasteners
          Hamitabat Natural Gas Combined Cycle Power Plant  Enexio Hungary Zrt.  279.173 $  24/03/2016  In Progress   of Cooling Water Unit
 COMPLETED PROJECTS and PROJECTS in PROGRESS  SUB TOTAL         224.896.965 $
          INDUSTRIAL PLANTS
                                                                                         Civil Works, Electrical Works, Machine
 Contract  Date of   Date of   Etibank Antalya Electrometallurgy Industries, Barite Grinding Plant   General Directorate of Etibank  48,851,185 $  09/01/1981  19/01/1982  and Equipment Supply and Installation,
 Project Name  Client  Job Description                                                   Manufacturing and Erection Works (600 tons)
 Amount  Contract  Completion
                                                                                         Steel Construction Manufacturing and
                                                                                         Erection (9830 tons); F16 Aircraft Factory
 HYDROMECHANICAL EQUIPMENT MANUFACTURING AND CONTRACTS   F16 Aircraft Factory, Production and Auxiliary Facilities   TAI Tusaş Aerospace Industry Inc.  89,888,370 $  12/04/1984  02/11/1987  Production Building Consisting of  Three Parts
                                                                                         With 241.7 Meters Length and 40 Meters
 Manufacturing of  Tunnel Invert Form,
 Kürtün Dam & HEPP Tunnel Formwork  Nurol Construction Inc.  1.570.222 $  29/09/1995  30/06/1996  Span, Eight Parts With 136.7 Meters and 30
 Ø 12 m Inner Dia.(98 tons)                                                              Meters Span, and With a Truss Height of 10 m.
 2x75+15 Tons Gantry Crane and   Sivas Iron and Steel Factory, Steel Mill Comprehensive   Steel Plant Continue Casting Unit Dust
 Kürtün Dam Permanent Equipment Gantry Crane and Valves   Nurol Construction Inc.  57.452.182 $  10/02/1997  29/09/2003  Hyadromechanical Equipment, Penstock and   Manufacturing Works   Sivas Iron and Steel  Factories Inc.  28,243,038 $  12/02/1990  10/07/1991  Collection, Conveyor and Bunkers
 Bottom Outlet Gate                                                                      8700 Tons Steel Construction, 1380 Tons
 Draft Tube, Inlet Pipe and Accessories   Sivas Iron and Steel Factory, Steel Mill Comprehensive
 Fethiye Dam,Turbine Parts and Equipments   K&AR Mühendislik ve Müşavirlik A.Ş.  783.995 $  28/07/1998  30/10/1998  Sivas Iron and Steel  Factories Inc.   75,665,140 $  09/04/1988  31/08/1992  Mechanical Manufacturing, 19400 Ton
 Manufacturing Works   Manufacturing Works                                               Equipment Erection
 Concrete Formwork Car and Reinforcement
 Kürtün Dam Concrete Formwork Car and Reinforcement Bar Car   Nurol Construction Inc.   3.275.587 $  01/03/1999  15/07/1999  General Directorate of State   Stainless Steel Storage Tanks, Bottling Plant
 Bar Car, Design, Manufacturing, Erection   Nevşehir Rakı Factory  140,661,497 $  15/12/1990  15/12/1991  and Technological Manufacturing Supply and
 Çal HEPP, (2 x 1,1 MW), Turbine Parts and  Hydromechanical   Spiral Case, Draft Tube, Inlet Pipe and   Monopolies  Erection
 Equipments Manufacturing  K&AR Mühendislik ve Müşavirlik A.Ş.  127.638 $  06/04/2000  15/09/2000  Accessories Manufacturing Works  Technological Machinery Manufacturing and
          Etibank-Elazığ Ferro-Chrome Plant   General Directorate of Etibank   90,745,107 $  25/09/1974  09/02/1977
 Spiral Case, Draft Tube, Inlet Pipe and                                                 Erection 4300 Tons
 Molu HEPP, Turbine Equipment Parts Manufacturing  Kössler GmbH  255.275 $  06/04/2000  15/01/2001
 Accessories Manufacturing Works                                                         Turn-Key Crushing and Shifting Plant
 Hydromechanical Equipment, Manufacturing   Ovacık,  Sand Preparation, Crushing and Sifting Plant  Cam-İş Co. Inc.  9,057,068 $  07/06/1995  19/12/1995  (50 Ton Steel Construction)
 Gaziler HEPP, Permanent Equipment Manufacturing and Erection   Gaziler Enerji ve Tic. A.Ş.  7.735.861 $  14/09/1999  10/06/2002
 and Erection                                                                            (70 Ton Technological Equipment)
 Hydromechanical Equipment Radial Gates,   Ovacık Kuvarsit Mining Plant, Crushing Plant   Cam-İş Co. Inc.  8,788,771 $  13/06/1995  21/01/1996  Turn-Key Crushing and Shifting Plant
 Kürtün Dam and HEPP  Nurol Construction Inc.   32.593.811 $  10/04/1997  09/08/2002
 Valves Manufacturing and Erection                                                       Delivery Proportioning Silos and Dust
 4 Each Radial Gates Manufacturing Works,   Çayırova Fine Grinding Plant   Cam-İş A.Ş. (Şişe-Cam)  19,769,398 $  09/05/1996  21/12/1996  Collection Unit, Turn Key Plant, Design,
 İnegöl - Yenişehir Boğazköy Dam  TİSAN A.Ş.  1.274.511 $  02/05/2005  30/11/2005
 400 Tons                                                                                Manufacturing Etc.
 Hydromechanical Equipments Manufacturing                                                Construction of Fine Grinding Building, Design,
 Seyrantepe Dam and HEPP  DARENHES Electric Production Inc.  3.461.657 $  01/09/2005  01/10/2008  Çayırova Fine Grinding Plant  Cam-İş A.Ş. (Şişe-Cam)  5,927,963 $  17/07/1996  15/04/1997
 and Assembly Works                                                                      Manufacturing and Erection Works
 Hydromechanical Equipments Manufacturing                                                Stainless Tanks 4 Each,Carbon Steel Tanks 18
 Çınarcık Dam   YAYLA Timtaş  1.010.027 $  21/06/2005  30/10/2008
 and Assembly Works   Erdemir - ET / TFS Facilities Project, Circulation Tanks & Steel Structure  Marubeni Corporation  9,645,353 $  28/02/1998  15/11/1998  Each Total  110 Tons, Steel Construction  Total
                                                                                         150 Tons
 Hydromechanical Equipment Manufacturing
 Oşkan ve Berkman    Enova Elektrik Üretim A.Ş.   10.840.776 $  09/05/2008  30/12/2009
 and Erection Works   Enerjisa HRSG Project   Gama A.Ş.          1,772,865 $  12/05/1999  16/08/1999  HRSG Section & Modul Manufacturing Works
 Hydromechanical Equipment Manufacturing                                                 Field Erected Fuel Oil Storage Tanks Capacity
 Algeria Douera Dam   Nurol Construction Inc.  3.410.437 $  24/11/2007  27/05/2009
                                                                                                       3
                                                                                                           3
                                                                                             3
 and Erection Works                                                                      5000 m , Double Shell 3000 m , 700 m , Shop
                                                                                         Fabricated Storage Tanks; Air Receiver Tank 6x50
 Hydromechanical Equipment Manufacturing   Çan Thermal Power Plant  Alstom Power Teknotes Ltd. Şti.  3,359,740 $  15/06/2001  25/06/2002
                                                                                          3
                                                                                                      3
 DIM Dam  İçkale Construction Inc.  30.057.631 $  04/06/1999  24/04/2009                 m , Condansate Tank 7,8 m , Slop Oil Tank 7,6
 and Erection Works
                                                                                         m , Hot water Accumulator Tank 1 m , Head Tank
                                                                                                          3
                                                                                          3
 Hydromechanical Equipment Manufacturing                                                 2x6,3 m , Glycol + Water Tank
                                                                                             3
 Yedisu Dam Hydromechanical Equipment  Özaltın İnşaat Ticaret ve Sanayi A.Ş.  5.455.332 $  09/03/2009  12/03/2012
 and Erection Works                                                                      Renovation of  6 Each Naphtha Tanks,
 Hydromechanical Equipment Manufacturing                                                 Total Capacity 60.000 m³, Incl. Design Acc.
 Yedigöl-Aksu Hydromechanical Equipments  Borusan Enerji A.Ş.  1.749.810 $  25/11/2009  05/01/2012
 and Erection Works   TÜPRAŞ IZMIT Renovation of 6 Each Naphtha Tanks Novation    Tüpraş A.Ş.  21,614,264 $  29/11/1999  18/07/2000  to API 650, Supply Aluminium Floating
                                                                                         Roof, Manufacturing, Erection, Civil Works,
 Butterfly Valve and Gate Revision and
 Beyköy Dam    Zorlu Enerji  84.753 $  18/05/2010  18/07/2010                            Electrical Works and Fire Fighting Systems.
 Erection
                                                                                         Total 9 Each, Cold Main Liming, Hot Main Liming,
 Hydromechanical Equipment Manufacturing
 Demirciler HEPP Hydromechanical Equipment  Akfen Energy   1.013.639 $  25/02/2011  12/12/2012  1  & 2  Carbonation, Reaction, Security, 1   st
                                                                                         st
                                                                                            nd
 and Erection Works   Kayseri Sugar Factory, Sugar Purification Tanks  Kayseri Sugar Factory   698,792 $  22/05/2003  30/09/2003
                                                                                         Stage Filter, 2  Stage Filter and Prelimer Vessels
                                                                                               nd
                                                                                         Fabrication, Transport and Erection Works.
 38                                                                                                     39