Ilısu Dam & HEPP, Mardin/TURKEY

            The  operations  in  parallel to  the graphic  achieved  with this   Construction works at the remaining sections of the project are
            successful history  are  continuing  quickly  with  the ongoing   in progress.
            domestic and overseas projects.
                                                                   Orhangazi 4th section between Km: 34+300 and 43+296 of the
            As per the implementation contract signed on 27 September   Gebze - Orhangazi - Izmir Motorway which includes the
            2010 between the General Directorate of Highways and Otoyol   construction of 9 km motorway, 2 bridges, 1 pedestrian bridge,
            Yatırım ve İşletme A.Ş., which became effective on 15 March   16 underpasses, 17 box culverts, 2 retaining walls and 9
            2013, 384 km of motorway and 43 km of access road, adding up   diversion  canals  was  completed  under  the  responsibility  of
            to a total of 427 km of motorway will be constructed to connect   Nurol at the end of 2015. 1.378 m long South approach viaduct
            Gebze  and  İzmir.    The  route  comprises  construction  of   of the Osmangazi suspension bridge which includes 35.000
            Osmangazi  Suspension Bridge which is the second longest   tonnes of steel works was another section under the sole
            suspension bridge in Europe and the fourth longest in the world   responsibility of Nurol was also completed on  April 2016.
            with its 4.500 m total length including approach viaducts and   Construction works commenced on 2015 and still ongoing at
            1.550 m mid-span, 29 viaducts, 3 motorway tunnels, 199 bridges,   the last section under our responsibility, Balıkesir- Kırkağaç-
            20 toll plazas, 25 interchanges, 6 operation and maintenance   Akhisar Section between Km: 224+300 and 317+284 and parts
            centers, 3 tunnel operation and maintenance centers and 18   of the section between Km: 224+300 to 230+500 (Balıkesir West
            motorway service facilities. Gebze - Orhangazi - Izmir Motorway   Intersection and Km: 310+513 (Akhisar Intersection) to 317+284
            (including Osmangazi Suspension Bridge and Connection   were completed and opened to traffic as of March 2019.
            Roads) Project is one of the biggest infrastructure investments
            in Turkey with its 7,7 billion USD value not including financing   NUROL Tower Business Complex and Nurol Park projects were
            costs and value added tax and sections between Gebze   completed on 2016 and works for NUROL Life Multipurpose
            Intersection and Bursa which includes Osmangazi suspension   Complex Project were completed on 2017 under the scope of
            Bridge, Km: 201+380 (Balıkesir North Intersection)-230+500   Nurol REIT's 800 million USD investment in İstanbul. NUROL
                                                                                                                    2
            (Balıkesir West Intersection) and Km: 310+513 (Akhisar Intersection)   Tower Çaglayan Business Complex was built on a 6.800 m
                                                                                                  2
            -408+655 (İzmir) have been completed and opened to traffic.   project area and consists of 74.000 m  closed area whereas























                                                                              Hasankeyf Group Bridges, Batman - Siirt/TURKEY