urol Göksu has been established in 2013 and has
acquired the operation right of Göksu HEPP via
Nprivatization for 49 years.
Göksu HEPP (run of river type hydroelectric power plants)
located on the Göksu river in the vicinity of Konya province
was taken into operation in 1959 with utilizing 80 m head.
Göksu HPP has 10,8 MW installed capacity and produces
annually 60 GWh energy with a consistent and stable high
capacity factor and steady flow regime.
Since Göksu HEPP is a renewable energy sourced project,
it contributes the reduction of 39.000 tons of CO emission
2
annualy.
Göksu HEPP's team is operating the Plant under the optimum
operating conditions and also carrying out marketing and
sales of generated electricity energy. Generated electricty is
sold under competitive free market conditions. NUROL GOKSU ELECTRICITY INC. (Thousand TL)
The investments for the rehabilitation and modernization of 2016 2017 2018
the equipments and water structures of the plant have been TOTAL ASSETS 165.271 171.337 243.754
carried out for reliable and continuous operation. TOTAL EQUITY 9.676 3.722 8.014
SALES INCOME 8.812 8.568 16.966
EBITDA 5.661 5.626 11.002
Figures are calculated from the consolidated financial statements in accordance with IFRS.