Page 39 - Annual Report 2018
P. 39

ackground;                                        been secured with a new loan package amounting to 4,956
                  the tender for Motorway Project for Gebze -       billion USD. The total investment amount for the entire
            BOrhangazi - Izmir (including İzmit Bay Crossing and    project is estimated to be 7,3 billion USD, funded from 4,956
             Connection Roads) was conducted on 9 April 2009 and the   billion USD debt, 1,5 billion USD equity and 800 million USD
             proposal submitted by Nurol - Özaltın -Makyol - Astaldi -   net early operational revenue. As of the end of January 2019,
             Yüksel - Göçay Group was selected as to be the best    approximately 6,6 billion USD has been spent towards
             proposal with 22 years and 4 months construction and   project costs, divided as follows: Phase I 2,80 billion USD,
             operating period.                                      Phase II A 600 million  USD and Phase II B 3,2 billion USD.
             OTOYOL YATIRIM  VE İŞLETME  A.Ş. was founded on 20     Turkish Lenders;
             September 2010 to perform the works of construction,
             operation and transfer of Gebze - Orhangazi – Izmir (including   Akbank, Finansbank, Ziraat Bankası, Garanti Bankası, Halk
             İzmit Bay Crossing and Connection Roads) Motorway Project   Bankası, İş Bankası, Vakıflar Bankası, Yapı ve Kredi Bankası.
             through Build - Operate - Transfer model.              Foreign Lenders;
             The project implementation agreement was signed        Deutsche Bank, Saudi National Commercial Bank, Bank of
             between the General Directorate of Highways and OTOYOL   China, Siemens Bank.
             YATIRIM VE İŞLETME A.Ş. on 27 September 2010.
                                                                    Project and Route
             The ceremony for start of construction works in Gebze for
             Gebze - Orhangazi - Izmir Motorway Project took place on   As this new project will shorten the route about 140 km when
             28 October 2010 in Dilovasi district of Kocaeli Province and   compared to the current state highway, the travel time
             Ceremony for start of construction works in İzmir was held   corresponding to 8-10 hours will be shortened to 3,5 - 4
             in Alsancak Cumhuriyet Square on 27 February 2011.     hours, which will provide  TL 870 million saving a year in turn.
             İstanbul - Bursa - İzmir   Motorway Phase I, Intersections   The starting point of the project is Gebze and the Motorway
             between Gebze and Gemlik (including Osmangazi          crosses İzmit bay located between Dilovası and Hersek
             Suspension Bridge) has been opened to traffic on July 1, 2016.  through a Suspension Bridge of approx 3.000 meters
                                                                    length, then will extend to Orhangazi and Gemlik and be
             The construction and acceptance of Phase II A (Gemlik -   connected to Bursa Ring Road at Ovaakça intersection.
             Bursa) was completed and opened to traffic on
             12 March 2017 with the opening ceremony.               Following the Bursa Ring Road which is already
                                                                    operational, the Motorway reaches Balıkesir starting with
             The construction and acceptance of 69 km in the Section   Bursa - Karacabey intersection and continuing through
             of Phase II B between (Balıkesir - Edremit) - İzmir Saruhanlı   the north of Susurluk. It continues south from the west of
             - Karasuluk intersections was completed and opened to   Balıkesir, ahead  via Savaştepe, Soma, Kırkağaç districts
             traffic on 1 December 2018 with the opening ceremony.  and continues towards the west near Turgutlu. It moves
                                                                    along  paralel to İzmir - Uşak state highway  and finally
             Otoyol  Yatırım ve İşletme A.Ş.
                                                                    connects with Anadolu Lisesi intersection over the İzmir
             Procured services such as gulf soil surveys, motorway   ring road.
             route soil surveys, signature of Motorway and Suspended
             Bridge construction contract and design works, legal   The project has a total length of 433 km including
             infrastructure studies and project consultancy services for   a highway length of 384 km and an access road length of
             the motorway project and performed activities required   49 km. Along the route, there are 38 viaducts with a total
             for preliminary preparation activities in physical aspects  length of 21.559 m, including the Osmangazi Suspension
             and project financing.                                 Bridge and the Northern / Southern Approach Viaducts,
                                                                    3 tunnels with a total length of 6.446 m, 176 bridges, 20 toll
             The Project financing for Phase I (from Gebze to Gemlik   collection areas, 24 intersections, 4 Highways and 2 Tunnel
             Intersection including the Osmangazi Suspension Bridge)   Maintenance-Operation  Centres,  as  well  as  35  Service
             and Phase II  A (from Gemlik Intersection to Bursa     Stations and Parking Areas.
             Intersection)  were completed in the first quarter of 2013
             and in the second quarter of 2014, respectively.
                                                                     OTOYOL YATIRIM VE İŞLETME A.Ş. (Thousand TL)
             The process of refinancing this debt to extend the maturity
             and secure required additional funding of 3 billion USD                          2016     2017    2018
             for Phase II B (from Bursa Intersection to İzmir) was   TOTAL ASSETS            17.641.523 23.284.502 35.897.304
             completed by signing the  finance documents  on June    TOTAL EQUITY            5.002.075 6.724.789 11.385.500
             05,2015. Thus, the funding required for the entire project in   SALES INCOME    3.853.409 5.499.165 6.292.385
             the form of refinanced loan of 2 billion USD for Phase I and   EBITDA           1.369.226 2.032.715 3.184.169
             Phase II A as well as funding required for Phase II B have   Figures are calculated from the consolidated financial statements in accordance with IFRS.