{"id":4981,"date":"2015-07-09T15:52:00","date_gmt":"2015-07-09T12:52:00","guid":{"rendered":"https:\/\/www.nurol.com.tr\/en\/nuroldan-dunya-ve-turkiye-rekoru.html"},"modified":"2016-11-17T16:27:25","modified_gmt":"2016-11-17T14:27:25","slug":"world-and-turkish-record-from-nurol","status":"publish","type":"post","link":"https:\/\/www.nurol.com.tr\/en\/world-and-turkish-record-from-nurol.html","title":{"rendered":"World and Turkish Record from NUROL&#8230;"},"content":{"rendered":"<p>In Gebze-Izmir Highway Project, one of the most important infrastructure works of the world, the <strong>\u201cSouth Approach Viaduct\u201d<\/strong>; the construction of which is undertaken by <strong>Nurol \u0130n\u015faat A.\u015e.<\/strong> and <strong>Nurol \u00c7elik A.\u015e.<\/strong> ,is completed by breaking a <strong>world record<\/strong> by using 1123 meters of streak plate method for this 22.500 tons of steel structure, within a short period like 2 years.<br \/>\nA <strong>Turkish record<\/strong> is added to this world record on Sunday, the 5th of July; The 2.600 tons of <strong>heaviest final deck<\/strong> of the South Approach Viaduct almost as big as a stadium with its 124 meters length and 36 meters width and manufactured by using Turkish workmanship, is placed to a height of 57 meters and thus <strong>\u201cThe Biggest Heavy Lifting Operation of Turkey\u201d<\/strong> is realized by Nurol.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In Gebze-Izmir Highway Project, one of the most important infrastructure works of the world, the \u201cSouth Approach Viaduct\u201d; the construction of which is undertaken by Nurol \u0130n\u015faat A.\u015e. and Nurol \u00c7elik A.\u015e. ,is completed by breaking a world record by using 1123 meters of streak plate method for this 22.500 tons of steel structure, within<\/p>\n","protected":false},"author":1,"featured_media":4990,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[54,55,58],"class_list":["post-4981","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-from-us","category-nurol-construction-and-trading-inc","category-nurol-machinery-and-industry-co-inc-steel-const-division"],"_links":{"self":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts\/4981","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/comments?post=4981"}],"version-history":[{"count":0,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts\/4981\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/media\/4990"}],"wp:attachment":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/media?parent=4981"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/categories?post=4981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}