{"id":23176,"date":"2025-01-23T10:33:12","date_gmt":"2025-01-23T07:33:12","guid":{"rendered":"https:\/\/www.nurol.com.tr\/timisoara-bati-cevre-yolu-tasarim-ve-yapim-isleri-projesi-imzalandi.html"},"modified":"2025-04-04T11:55:00","modified_gmt":"2025-04-04T08:55:00","slug":"timisoara-western-bypass-design-and-construction-project-signed","status":"publish","type":"post","link":"https:\/\/www.nurol.com.tr\/en\/timisoara-western-bypass-design-and-construction-project-signed.html","title":{"rendered":"Timisoara Western Bypass Design and Construction Project Signed"},"content":{"rendered":"<p>The Timisoara Western Bypass Design and Construction Project tender, issued by the Romanian National Road Infrastructure Administration (CNAIR) on May 15, 2024, accepted Nurol \u0130n\u015faat&#8217;s proposal following technical and financial evaluations. The contract for the project was signed on January 23, 2025.<\/p>\n<p>With a total contract value of 295,251,250.09 USD, the project duration was set at 30 months, including 6 months for design and 24 months for construction. The 13.9 km highway project includes 10 bridges, totaling 3,031 meters in length, 4 intersections, 2 parking areas, and 25 km of connecting roads. The highway, financed by European Union funds, is planned to have 4 lanes, with 2 lanes in each direction.<\/p>\n<p>We extend our best wishes for the successful completion of this important project for our Group.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Timisoara Western Bypass Design and Construction Project tender, issued by the Romanian National Road Infrastructure Administration (CNAIR) on May 15, 2024, accepted Nurol \u0130n\u015faat&#8217;s proposal following technical and financial evaluations. The contract for the project was signed on January 23, 2025. With a total contract value of 295,251,250.09 USD, the project duration was set<\/p>\n","protected":false},"author":1,"featured_media":23174,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[54],"class_list":["post-23176","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-from-us"],"_links":{"self":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts\/23176","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/comments?post=23176"}],"version-history":[{"count":3,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts\/23176\/revisions"}],"predecessor-version":[{"id":23334,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts\/23176\/revisions\/23334"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/media\/23174"}],"wp:attachment":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/media?parent=23176"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/categories?post=23176"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}