{"id":18192,"date":"2020-07-03T10:36:32","date_gmt":"2020-07-03T07:36:32","guid":{"rendered":"https:\/\/www.nurol.com.tr\/?p=18192"},"modified":"2020-07-03T10:36:32","modified_gmt":"2020-07-03T07:36:32","slug":"turkeys-largest-dam-begins-operations-anadoluda-bugun-20-5-2020","status":"publish","type":"post","link":"https:\/\/www.nurol.com.tr\/en\/turkeys-largest-dam-begins-operations-anadoluda-bugun-20-5-2020.html","title":{"rendered":"Turkey\u2019s Largest Dam Begins Operations \/ Anadolu&#8217;da Bug\u00fcn | 20.5.2020"},"content":{"rendered":"<p>President Recep Tayyip Erdo\u011fan said: \u201cIl\u0131su Dam, which is Turkey\u2019s fourth largest dam with a total installed power of 1,200 megawatts, and the second largest dam in terms of fill volume, is the number one dam in the world in the concrete-coated rockfill dam category.<br \/>\nPresident Erdo\u011fan attended the Commissioning Ceremony of the 1st Turbine of the Power Plant of Il\u0131su Dam via a video link-up. Stating that the first unit, which has a capacity of 200 MW, was commissioned in the first phase, President Erdo\u011fan provided the following information about the hydroelectric power plant, which has a total annual energy generation capacity of 4.1 billion kWh: \u201cBy putting into service one turbine each month, we will have commissioned Il\u0131su with full capacity by the end of the year. The total cost of Il\u0131su has reached 18 billion liras, taking into account the expenditures for relocations, the protection of historical and cultural artifacts, the construction and other expenses. We expect the dam to generate 2.8 billion lira in revenues on an annual basis.\u201d <\/p>\n","protected":false},"excerpt":{"rendered":"<p>President Recep Tayyip Erdo\u011fan said: \u201cIl\u0131su Dam, which is Turkey\u2019s fourth largest dam with a total installed power of 1,200 megawatts, and the second largest dam in terms of fill volume, is the number one dam in the world in the concrete-coated rockfill dam category. President Erdo\u011fan attended the Commissioning Ceremony of the 1st Turbine<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"#ffffff","slide_template_v7":"","footnotes":""},"categories":[53],"class_list":["post-18192","post","type-post","status-publish","format-standard","hentry","category-nurol-in-media"],"_links":{"self":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts\/18192","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/comments?post=18192"}],"version-history":[{"count":0,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts\/18192\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/media?parent=18192"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/categories?post=18192"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}