{"id":13398,"date":"2017-01-20T11:53:27","date_gmt":"2017-01-20T08:53:27","guid":{"rendered":"https:\/\/www.nurol.com.tr\/?p=13398"},"modified":"2017-05-24T11:54:06","modified_gmt":"2017-05-24T08:54:06","slug":"ilisu-a-contribution-to-national-economy-ticari-hayat-20-01-2017","status":"publish","type":"post","link":"https:\/\/www.nurol.com.tr\/en\/ilisu-a-contribution-to-national-economy-ticari-hayat-20-01-2017.html","title":{"rendered":"Il\u0131su: a Contribution to National Economy | Ticari Hayat \/ 20.01.2017"},"content":{"rendered":"<p>Veysel Ero\u011flu, Minister of Forestry and Water Management, declared that with a total cost of 1 billion euro Il\u0131su Dam and Hydroelectrical Powerplant will contribute the national economy around 1.3 billion Turkish Lira per year just from the power generation. In his declaration Minister Ero\u011flu pointed out that Il\u0131su Dam and Power Plant is one of the two pillars of GAP and added: \u201cThis project is the vision project of our country. Il\u0131su Dam and Hydroelectrical Powerplant, costs of 1 billion euro in total, will contribute the national economy around 1.3 billion Turkish Lira per year just from the power generation. Ero\u011flu stated that the region will rear up, so to speak, and said: \u201cIl\u0131su Dam will increase the welfare level of the people in the region in addition to the contribution it will make to the national economy in the fields of irrigation and power. The project also contribute to decrease the unemployment problem in the region. When totally completed, it will provide an area of employment for 4000 people and hence will create a source of living for 28 thousand people in total together with the families.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Veysel Ero\u011flu, Minister of Forestry and Water Management, declared that with a total cost of 1 billion euro Il\u0131su Dam and Hydroelectrical Powerplant will contribute the national economy around 1.3 billion Turkish Lira per year just from the power generation. In his declaration Minister Ero\u011flu pointed out that Il\u0131su Dam and Power Plant is one<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[53],"class_list":["post-13398","post","type-post","status-publish","format-standard","hentry","category-nurol-in-media"],"_links":{"self":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts\/13398","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/comments?post=13398"}],"version-history":[{"count":0,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts\/13398\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/media?parent=13398"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/categories?post=13398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}