{"id":12352,"date":"2017-04-24T18:25:11","date_gmt":"2017-04-24T15:25:11","guid":{"rendered":"https:\/\/www.nurol.com.tr\/umraniye-atasehir-goztepe-metrosu-ihalesini-nurol-insaat-aldi.html"},"modified":"2017-05-15T17:12:09","modified_gmt":"2017-05-15T14:12:09","slug":"umraniye-atasehir-goztepe-metrosu-ihalesini-nurol-insaat-aldi","status":"publish","type":"post","link":"https:\/\/www.nurol.com.tr\/en\/umraniye-atasehir-goztepe-metrosu-ihalesini-nurol-insaat-aldi.html","title":{"rendered":"\u201c\u00dcmraniye \u2013 Ata\u015fehir \u2013 G\u00f6ztepe Metro Line\u201d contract has been signed"},"content":{"rendered":"<p style=\"text-align: justify; background: white; margin: 12.0pt 0in 12.0pt 0in;\"><span style=\"font-family: 'Tahoma','sans-serif'; color: #2a343a;\">\u201c\u00dcmraniye \u2013 Ata\u015fehir \u2013 G\u00f6ztepe Metro Line\u201d contract has been signed between \u0130stanbul Municipality and Nurol\u2019s Joint Venture on 14th of April 2017. Project scope consists of 11 stations, 13 km long double TBM Tunnel, 2 train depots (NATM), and a connection tunnel (NATM). Supervision of maintenance and operation, preparation of operation and maintenance manuals, provision of spare parts and consumables and providing training for staff is also included in the scope.<\/span><\/p>\n<p style=\"text-align: justify; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 12.0pt 0in 12.0pt 0in;\"><span style=\"font-family: 'Tahoma','sans-serif'; color: #2a343a;\">The construction period will be 1020 days.<\/span><\/p>\n<p style=\"text-align: justify; background: white; font-variant-ligatures: normal; font-variant-caps: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; text-decoration-style: initial; text-decoration-color: initial; word-spacing: 0px; margin: 12.0pt 0in 12.0pt 0in;\"><span style=\"font-family: 'Tahoma','sans-serif'; color: #2a343a;\">We wish that the project will serve our country in a best possible way.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u201c\u00dcmraniye \u2013 Ata\u015fehir \u2013 G\u00f6ztepe Metro Line\u201d contract has been signed between \u0130stanbul Municipality and Nurol\u2019s Joint Venture on 14th of April 2017. Project scope consists of 11 stations, 13 km long double TBM Tunnel, 2 train depots (NATM), and a connection tunnel (NATM). Supervision of maintenance and operation, preparation of operation and maintenance manuals,<\/p>\n","protected":false},"author":1,"featured_media":12087,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[54],"class_list":["post-12352","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-from-us"],"_links":{"self":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts\/12352","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/comments?post=12352"}],"version-history":[{"count":0,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/posts\/12352\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/media\/12087"}],"wp:attachment":[{"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/media?parent=12352"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nurol.com.tr\/en\/wp-json\/wp\/v2\/categories?post=12352"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}